- In case of any leakage in power supply, get it rectified immediately. Replace defective electrical fittings and appliances promptly. Avoid loose connections & joints.
- Install safety equipments for Earth leakage/Over load and Short circuit protection. Near point of supply.
- Use proper capacity fuse wire and ensure healthy earthlings at the premises.
- Get the wiring done through licensed Electrical contractors.
- Use ISI marked equipments and cables of proper capacity even they cost more.
- Ensure safety of meter and metering equipments. Prefer waterproof enclosures for them.
- Construct building with proper clearance from HT/LT tension lines as per IER 1956.
- Use electricity only for purpose for which the service connection has been given.
- If energy meter is found stopped/defective please bring the matter in knowledge of MPPKVVCL authorities immediately in writing.
- Pay energy bills regularly at authorized cash counters only within due date to avoid inconvenience due to disconnection.
- For any difficulties related to electricity supply, always contract MPPKVVCL authorities at their offices.
- Observe safety precautions to avoid electrical accidents.
- Stay away from a downed power line and informed MPPKVVCL office immediately.
- Beware of sub-station & transmission lines stay clear of sub-station, poles, towers structures.